There are two ways to sell a catalytic converter. On exchange terms a buyer pays a fixed price per unit, by category or part number, on the day. On assay terms the converters are cut open, the ceramic is milled and sampled, and you are paid for the platinum, palladium and rhodium the laboratory finds, less the refiner's deductions. Assay usually returns more of the metal's value, but published refiner terms start at 500 whole converters or 500 kilograms to 1,000 pounds of ceramic, settlement takes weeks to months, and metal prices can move against you while you wait. For one converter or a small batch, exchange pricing is the practical choice.
Exchange and assay side by side
| Exchange (unit price) | Assay (toll refining) | |
|---|---|---|
| How the price is set | Fixed price per unit by category or part number | Laboratory measurement of the metal in a milled, sampled lot |
| Minimum quantity | One converter | 500 whole units or 1,000 lb of ceramic at one US refiner; 500 kg at one European refiner |
| When you are paid | On the day | 30 to 40 days at one US refiner; refining can take around three months at another |
| Who carries metal price risk | The buyer | You, unless the price is fixed in advance |
| Main cost to you | The buyer's margin, built into the price | Payable percentages, treatment, refining and lot charges |
| Best for | Singles, small batches, mixed lots | Large, consistent lots from yards, muffler shops and dismantlers |
Published refiner terms
| Term | Specialty Metals, US | Ecotrade Group, Europe |
|---|---|---|
| Minimum lot | 500 whole converters or 1,000 lb of loose catalyst | 500 kg of ceramic, or 500 pieces |
| Platinum paid | 90 percent | typically 96 to 98 percent |
| Palladium paid | 90 percent | typically 96 to 98 percent |
| Rhodium paid | 75 percent | typically 88 to 93 percent |
| Other charges | None, as published | Treatment charge of about 200 to 500 dollars per lot, refining charges, small-lot charge below 500 kg |
| Timing | Paid within 30 to 40 days | Refining around three months after arrival |
The two sets of terms are not directly comparable: one bundles its costs into lower payable percentages, the other pays a higher share of the metal and then deducts charges. Ecotrade's own guide puts total recycling cost at roughly 10 to 12 percent of the metal value for ceramic converters and 12 to 15 percent for metallic foil units. Rhodium is always paid at a lower share because it is harder to recover.
A worked example
This illustration uses London prices on 30 October 2026: platinum 1,426.95 dollars, palladium 976.85 dollars and rhodium 9,275 dollars a troy ounce. It assumes a lot of 500 converters averaging 1 gram of platinum, 2.7 grams of palladium and 0.3 grams of rhodium each, about 4 grams in total, inside the 3 to 7 grams one US refiner describes for a standard converter. Real lots vary widely, so this shows the arithmetic, not a forecast.
| Step | Value |
|---|---|
| Platinum contained, 500 g | about 22,940 dollars |
| Palladium contained, 1,350 g | about 42,400 dollars |
| Rhodium contained, 150 g | about 44,730 dollars |
| Total metal value | about 110,070 dollars, or 220 dollars a converter |
| Paid at 90, 90 and 75 percent, no other charges | about 92,350 dollars, or 185 dollars a converter |
| Paid at 97, 97 and 90 percent, less a 350 dollar treatment charge | about 103,280 dollars, or 207 dollars a converter, before refining and finance charges |
| Total cost of 10 to 12 percent, per one refiner's guide | about 96,860 to 99,060 dollars |
Rhodium carries almost as much value as palladium here despite being a tenth of the weight, which is why its lower payable share matters, as explained in rhodium price explained. Price risk matters too: platinum fell about 17 percent in the month to 30 October 2026, which on this lot would cut about 3,800 dollars from the platinum alone if it happened between delivery and settlement.
Why exchange prices sit below assay value
An exchange price is the buyer's estimate of what a unit will return on assay, minus their processing, freight, financing and margin, and minus a cushion for the metal falling before they sell. That is why the same unit pays less as a single than its share of an assayed lot. In return you are paid the same day, carry no price risk and need no minimum. For a single unit, the best exchange price comes from reading the part number and comparing two code-based quotes, using the site's serial number method and the grade guides for foreign and bead units.
When assay is worth it
- Volume: you can reach a refiner's minimum lot, usually 500 converters or 500 kg to 1,000 lb of ceramic, without holding stock for months.
- Consistency: your converters come from similar vehicles, so a sample represents the lot.
- Cash flow: you can wait 30 days to three months for settlement.
- Price control: you can fix the metal price when the assay is reported, or hedge, rather than leave the lot exposed.
- Paperwork: you can document where every converter came from, which refiners and states require.
If you fall short on any of these, sell on exchange terms. Smaller sellers who want assay-based pricing usually go through a processor that pools lots, and should ask for an itemised settlement showing weights, assay grams, payable percentages and each charge, as described in how converter recycling works.
Exchange and assay by country
| Market | Usual route for sellers | Notes |
|---|---|---|
| United States | Exchange pricing at yards and core buyers; toll refining for large lots | State converter laws apply to both routes |
| United Kingdom and Germany | Code-based exchange pricing; European refiners offer toll refining from about 500 kg | Prices quoted in pounds or euros |
| Japan | Exchange pricing through dismantlers and collectors | Domestic refiners handle most volume |
| India and Bangladesh | Exchange pricing by code through aggregators | Shipping ceramic abroad for refining can require waste-shipment paperwork |
| South Africa | Exchange pricing, with domestic PGM refining capacity | Home to most of the world's platinum mining |
Country pages: United Kingdom, Germany, Japan, India, Bangladesh and South Africa.
Local: selling converters in the US
Whichever route you choose, state rules on who may sell and buy detached converters still apply, along with ID, records and in some states payment by check rather than cash, as covered in catalytic converter theft laws and who buys catalytic converters legally. State pages: California, Texas and New York. Vehicle owners replacing a converter can compare repair costs in the replacement cost guide, and sellers can compare exchange buyers in who pays most or find a licensed buyer below:
- Arizona
- California
- Florida
- Georgia
- Illinois
- Michigan
- New York
- Ohio
- Pennsylvania
- Texas
Yard listings for United States are being added from official dealer registers and trade directories. Nothing is published until it has been verified against a named source, which is why this section is not yet populated.
How these prices are calculated
Converter figures on this page are not computed from the site's metal feed. Refiner terms are quoted as published by each company, the worked example uses London prices on 30 October 2026 and an assumed metal loading that is stated in the example, and exchange prices come from dated buyer boards. Treat every figure as an indicative reference rather than an offer, and get written terms before you ship a lot. How we source and calculate is laid out in the editorial policy and the methodology; for exchange prices by category, see the catalytic converter price today page.
| Benchmark | Source | Unit | Latest | As of |
|---|---|---|---|---|
| Copper | COMEX copper futures (Daily feed) | USD per lb | 5.61 | Nov 23, 2026 |
| Aluminum | CME aluminum futures (Daily feed) | USD per tonne | 2,813 | Nov 23, 2026 |
| Hrc | CME US hot-rolled coil steel (Daily feed) | USD per ton | 1,410 | Nov 23, 2026 |
| Scrap_ferrous | BLS iron and steel scrap index, anchored to export parity (Monthly series) | USD per ton | 300 | Oct 1, 2026 |
| Platinum | NYMEX platinum futures (Daily feed) | USD per oz | 1,314 | Nov 23, 2026 |
| Palladium | NYMEX palladium futures (Daily feed) | USD per oz | 894 | Nov 23, 2026 |
| Gold | COMEX gold futures (Daily feed) | USD per oz | 3,635 | Nov 23, 2026 |
| Silver | COMEX silver futures (Daily feed) | USD per oz | 43 | Nov 23, 2026 |
| Lead | IMF lead price (monthly) (Monthly series) | USD per tonne | 1,873 | Sep 1, 2026 |
| Zinc | IMF zinc price (monthly) (Monthly series) | USD per tonne | 4,021 | Sep 1, 2026 |
| Nickel | IMF nickel price (monthly) (Monthly series) | USD per tonne | 16,324 | Sep 1, 2026 |
| Rhodium | Rhodium (dealer reference) (Reference value) | USD per oz | 9,025 | Nov 23, 2026 |
| Scrap grade | Derived from | Share of benchmark | Unit |
|---|---|---|---|
| Copper Scrap | Copper x 87% | 87% | per lb |
| Aluminum Scrap | Aluminum x 55% | 55% | per lb |
| Brass Scrap | Copper x 46.8% + Zinc x 25.2% | 72% | per lb |
| Stainless Steel Scrap | Nickel x 7.5% | 7.5% | per lb |
| Steel Scrap | Scrap_ferrous x 100% | 100% | per ton |
| Iron Scrap | Scrap_ferrous x 88% | 88% | per ton |
| Lead Scrap | Lead x 70% | 70% | per lb |
| Zinc Scrap | Zinc x 22% | 22% | per lb |
| Car Scrap | Scrap_ferrous x 120% | 120% | per ton |
| Battery Scrap | Lead x 27% | 27% | per lb |
| Radiator Scrap | Copper x 50% | 50% | per lb |
| Wire Scrap | Copper x 42% | 42% | per lb |
| Cable Scrap | Copper x 28% | 28% | per lb |
| Cast Iron | Scrap_ferrous x 96% | 96% | per ton |
| Electronic Scrap | Copper x 12% | 12% | per lb |
| Bare Bright Copper | Copper x 93% | 93% | per lb |
| Number 1 Copper | Copper x 89% | 89% | per lb |
| Number 2 Copper | Copper x 82% | 82% | per lb |
| Light Copper | Copper x 66% | 66% | per lb |
| Tinned Copper | Copper x 80% | 80% | per lb |
| Irony Copper | Copper x 55% | 55% | per lb |
| THHN Wire | Copper x 40% | 40% | per lb |
| Romex Wire | Copper x 35% | 35% | per lb |
| Communication Wire | Copper x 26% | 26% | per lb |
| Copper Pipe and Tubing | Copper x 87% | 87% | per lb |
| Copper Roofing and Sheet | Copper x 66% | 66% | per lb |
| Copper Bus Bar | Copper x 90% | 90% | per lb |
Daily feeds update each trading day; monthly series update once a month, so rows built on them move monthly. Yard offers sit below these references after grading, freight and margin. How sources are chosen: editorial policy. How grades are derived: methodology.