Almost everything written in English about trading with China assumes you are buying. The advice, the payment structures, the horror stories: all of it is written for the importer, with the Chinese party as the seller. You are on the other side. Your money risk, your document risk and your inspection risk all sit in different places.
This is what actually happens, in order, the first time you send a container of scrap to China.
Before you quote
Verify the buyer before you spend an hour on anything else. Take the eighteen-character Unified Social Credit Code from their business licence, confirm it on the national registry, check the status reads active, and read the business scope to confirm it covers renewable resources or scrap. A company trading outside its registered scope cannot invoice your transaction correctly, and under China's current tax rules that becomes your problem as well as theirs.
Ask which standard edition they work to. GB/T 38471-2023 for copper, GB/T 38472-2023 for cast aluminium, GB/T 39733-2024 for ferrous. If they quote a 2019 or 2020 edition, they are behind, and you need to know that before you grade to their sheet.
Ask about their invoicing headroom. This sounds intrusive and is not. Chinese recyclers buying from individuals operate under a reverse invoicing allowance capped at five million yuan over twelve consecutive months, and traders report it can be exhausted in one or two months at current copper prices. A buyer whose allowance refreshes next quarter is a different counterparty from one who has just used theirs. Most will tell you if you ask plainly.
Agree the document list in the contract, not later. Which documents, who produces each, who pays each fee. The single most common avoidable failure in first shipments is a document nobody agreed to produce.
Before you load
This is where the shipment is actually won or lost, and it is entirely on your side of the ocean.
Pick one category per container. Not one metal, one category. Copper wire, mixed copper and copper nodules are three separate categories with three separate customs codes. Cast, wrought and pure aluminium likewise. Chinese rules do not permit different categories on the same declaration form, and for ferrous, clause 8.1.1 states each container generally carries the same category and the same grade. If you must combine, package independently, place separately, and mark clearly.
Grade to a margin, not to the threshold. Copper No. 1 and No. 2 require a minimum 97 percent copper content and nodules 98 percent. Ferrous carries residual limits of 0.300 percent copper, 0.050 percent phosphorus and 0.050 percent sulphur. A load sitting at 97.2 against a 97 threshold has no room for sampling variation. A load at 98.5 does.
Take your own samples and keep the record. Before the inspector does, not after. If there is a dispute later, your pre-shipment assay is the only evidence you control.
Prepare surfaces if you are near a limit. Aluminium is read by optical emission spectrometry, which measures what it can see. Oxide, oil and paint move the number.
Dry the load. The copper standard no longer measures moisture; it measures volatile substance, which captures oils, solvents and coolant as well as water. A load that passed a moisture check can fail this one. The ferrous standard separately requires protection from rain and snow in transport and storage.
Write down the numbers you will declare. Clause 9.2 of the copper standard requires accompanying documents stating supplier name, category and code, gross and net weight, foreign substances and coatings, other volatile substances, and physical quantity of copper. The last three are declared values, not descriptions. You are putting a number on a document with your name on it.
Pre-shipment inspection
China Certification and Inspection Group inspects at the port of loading before the vessel sails. This is the stage most first-time exporters do not expect, and it is the one that protects them.
The inspectors take representative samples to measure the exact percentage of foreign matter, assess contamination against the applicable limits, and cross-reference the physical cargo against your commercial invoice, your packing list and the licence held by your Chinese buyer. A discrepancy between declared weight, described alloy and actual goods can suspend certification on the spot.
They also check that the material is baled or containerised securely enough not to spill or mix in transit, because mixing in transit converts a compliant load into a non-compliant declaration.
Confirm with your buyer and your forwarder whether pre-shipment inspection applies to your specific category and route; the requirement is not uniform. Where it does apply, treat a failure here as good news. Re-grading on your own dock costs a day. The alternative costs the voyage.
The documents
The core package is the commercial invoice, the packing list, the bill of lading, the certificate of origin and, where required, the pre-shipment inspection certificate. For recycled raw materials, add the quality certificate the standard requires for each delivery batch.
Three practical points.
The commercial invoice is the document customs works from. It has to agree with the packing list and with the metal.
The packing list carries weights and dimensions and should not carry prices. It is a customs and handling document, not a commercial one.
Review the draft bill of lading meticulously before it is issued. Corrections before issue are free. Corrections after the vessel sails are expensive and slow, and a B/L that does not match the other documents produces exactly the holds you are trying to avoid.
Get the complete document list agreed before you accept a deposit, not after the vessel sails. Missing or inconsistent documents at destination translate directly into demurrage, customs holds and forwarder invoices nobody budgeted for.
Getting paid
Here is where being the seller changes everything.
The standard structure discussed in import guides is 30 percent in advance and 70 percent against a copy of the bill of lading. As the exporter, that rhythm works in your favour: the deposit covers your preparation and grading cost, and the balance falls due once you can prove the goods are on the water.
The bill of lading is the control instrument. Whoever holds the original controls the cargo. Do not release originals until the balance is settled or an equivalent protection is in place. A telegraphic release requested before payment is a request to give up your security.
For a first shipment with an unproven counterparty, a letter of credit costs more and is worth it. Payment against documents through your bank is the middle ground. The point is not which instrument you choose; it is that on a first container you should not be carrying both the production risk and the payment risk.
The voyage, and what it costs you
Europe to China runs roughly forty days door to door, longer if routed via the Cape of Good Hope, which adds ten to fourteen days on Asia to Europe lanes. Transpacific into China is faster, fourteen to eighteen days port to port on the main lanes.
That time is money. Forty days on a container of copper worth a quarter of a million dollars, at six percent, is around sixteen hundred dollars of financing you will never see on an invoice. Put it in your price.
Scrap into China also rides the cheap direction. Containers return to Asia regardless, so your freight is backhaul rather than headhaul, which is the main reason the arithmetic works at all from some origins and never works from others.
Arrival
Chinese customs inspect imported recycled raw materials under General Administration of Customs Announcement No. 39, in force since 10 June 2021.
The sequence is sensory inspection first. Most consignments are decided visually, which is why a tidy, homogeneous load attracts less attention than a mixed-looking one regardless of what the assay says. If visual assessment cannot determine compliance, laboratory testing follows against the relevant national standards. Radioactive contamination is checked under separate requirements. If customs suspects the material is actually solid waste, it can refer it to a specialist body for determination.
A failure at this stage is not a discount. Guangdong Customs seized 72.4 tonnes across three containers of non-conforming recycled brass crumb and aluminium blocks, sealed them, and had the material shipped back out of the country under customs supervision. The seller paid freight both ways and recovered nothing.
What usually goes wrong on a first container
Mixed categories loose in one box. The most common failure, and it is a declaration failure rather than a metal failure. The metal may be perfect.
Grading to the line. Sampling variation does the rest.
A document nobody agreed to produce. Discovered at the far end, resolved by demurrage.
A buyer who goes quiet mid-voyage. Often the invoicing allowance rather than bad faith, but the effect on you is identical if you have released the originals.
Assuming a code that cleared before still clears. The categories and customs codes changed on 15 November 2024.
What a good first shipment looks like
One category. One grade. Comfortably inside the threshold rather than on it. Sampled and recorded before it left your yard. Documents agreed in the contract and matching each other. Deposit received before loading, balance against documents. Originals held until paid.
It is not complicated. It is just unforgiving of the steps people skip, and the second container is much easier than the first.
*Last checked: 11 September 2026. General information for exporters, not legal, customs or financial advice. Reviewed quarterly.*
Going deeper: verify the buyer properly, what customs inspects, the standards your load must meet, and why a buyer goes quiet.
Part of the complete guide to exporting scrap metal to China, which carries every standard, code and limit in one reference table.