EU Scrap Exports After 2027: The Audit Nobody Has Arranged

From 21 May 2027 every recovery facility outside the EU must hold an accredited third-party audit, including in OECD countries. Turkey is not exempt.

Last updated

If you export scrap out of the European Union, two dates decide whether your existing customers are still customers.

21 May 2026 has already passed. Every shipment procedure is now digital, through a central EU system.

21 May 2027 is the one to plan for, and it is closer than it looks, because the paperwork it requires has to exist before you ship rather than when you ship.

What actually changed

Regulation (EU) 2024/1157 replaced the 2006 waste shipment regulation and became applicable on 21 May 2026. It is the biggest reform of the EU waste shipment regime in nearly two decades.

The purpose, stated plainly in the regulation, is to keep more waste inside high-standard EU recycling systems, reduce illegal shipments, and tighten exports to destinations where environmentally sound treatment cannot be demonstrated.

Metals sit on the green list. They are not hazardous waste and the hazardous export bans do not apply to them. That is the good news, and it is why most scrap exporters have paid limited attention so far.

The green list is exactly where the 2027 changes land.

The non-OECD list

From 21 May 2027, exports of green-listed waste for recovery to a non-OECD country are only possible if that country appears on a list maintained by the European Commission.

To get on it, a non-OECD country had to submit a formal request demonstrating it can manage the waste in an environmentally sound manner under conditions equivalent to those in the EU, with documentation set out in Annex VIII of the regulation.

The deadline for the first round was 21 February 2025. Requests received after that are not discarded, but are considered for updates to the list after 21 November 2026. The list is updated at least every two years.

Exports to non-OECD countries not on the list are prohibited from 21 May 2027.

For a scrap exporter the practical map is simple. China and India are not OECD members. Whether you can continue shipping to them from the EU after May 2027 depends on whether they are on that list. Turkey is an OECD member, so the country-list question does not arise for Turkish destinations.

If your business depends on a non-OECD destination, checking the current list is not optional homework. It is the first thing to do.

The audit requirement, which catches everyone

This is the provision most exporters have not absorbed, and it does not care whether the destination is OECD or not.

From 21 May 2027, waste recovery facilities located outside the EU, including those in OECD and EFTA countries, must have undergone an independent, accredited third-party audit. The audit has to demonstrate that the facility is managed under conditions close to the Best Available Techniques adopted by the EU under the Industrial Emissions Directive.

The obligation sits in Article 46 and Annex X, and it applies to facilities receiving both green-list and amber-list waste.

Three operational points follow.

The audit is on a two-year cycle. It must be renewed every two years, and a facility can be required to carry out an ad-hoc audit if information emerges suggesting it no longer complies, including through civil society action.

The exporter has to hold the documentation. You must be able to prove the waste will be managed in an environmentally sound manner at the specific facility receiving it, based on facility-level information and documentation, and keep that available for authorities.

The Commission maintains a register of audited facilities.

So from May 2027, selling scrap out of the EU means your buyer's plant has to be audited, and you have to hold the evidence. That applies to a Turkish mill just as much as to a Chinese one.

The timing is the part to act on now. Arranging an accredited third-party audit of a foreign facility is not a two-week exercise, and if your counterparty has not started, the conversation needs to happen this year rather than next.

Which rules already apply

Several things did not wait for 2027.

All procedures are digital. Since 21 May 2026, information exchange on shipments runs through a central EU system rather than on paper.

Green-listed waste for recovery carries new reporting obligations, even where the shipment itself remains permitted.

Intra-EU shipments for disposal are generally prohibited, and the general ban on exporting waste for disposal to any third country continues.

Hazardous waste and waste containing persistent organic pollutants cannot go to non-OECD countries. That was true before and remains true.

Member States must provide effective, proportionate and dissuasive penalties, and an Enforcement Group has been created to improve cooperation between countries on detecting illegal shipments. Enforcement capacity is being built deliberately, not incidentally.

What this means alongside the destination rules

Read this against the import side and the picture gets tighter from both ends.

China requires material to meet its recycled raw material standards, and is non-OECD, so from May 2027 an EU seller also needs China to be on the Commission's list.

India checks for explosives and radiation, and is non-OECD, so the same list question applies.

Turkey licenses the importer and requires a permit filed three business days ahead, and is OECD, so the list question does not apply, but the facility audit does.

In every case, from May 2027, the EU seller carries a documentation burden about the receiving facility that sits on top of whatever the destination country requires. Two regimes, both of which have to be satisfied, neither of which substitutes for the other.

What to do now

Confirm the OECD status of every destination you sell to. It determines which set of rules bites.

For non-OECD destinations, check the Commission list. If a country you depend on is not on it, you have until May 2027 to find an alternative or to see whether it gets added in a later update.

Ask every overseas buyer about their facility audit. Specifically: has an accredited third-party audit been carried out, when, and can they provide the documentation. A buyer who does not know what you are talking about is a buyer with a 2027 problem.

Start holding facility-level documentation now. The obligation is to prove environmentally sound management at the specific facility. That is a records practice, not a one-off certificate, and it is easier to build gradually.

Do not assume OECD membership is a free pass. The audit requirement explicitly covers OECD and EFTA facilities.

What is still moving

The country list is updated at least every two years, and later requests continue to be considered, so a destination that is off the list in 2027 is not necessarily off it permanently.

The delegated regulation updating Annexes III to V took effect in January 2025, and further technical amendments are likely as the regime beds in.

Confirm the current position for your specific waste codes and destinations with your national competent authority before making commitments that run past May 2027. This is a summary of a regulation that runs to hundreds of pages, and the detail is where the exceptions live.

*Last checked: 11 September 2026. This summarises a regulation running to hundreds of pages. Confirm your waste codes and destinations with your national competent authority. Reviewed quarterly.*

The destination side: China, India, Turkey, and which of them actually pays most.